久久综合香蕉久久久久久久,亚洲国产美女精品久久,久久久久久久999,久久久精品久久

Design & Tooling

Automotive Mould E-catalogue
I'm on line,contact now.

Production Process
Home?>>? Design & Tooling?>>? Production Process

The quality goes in before the name goes on
1. Mould manufacture standard documents will be done by Engineering Dept an we will have a meeting for the new mould.
2. Mould design: 3D,2D drawing designed according to customers' requests and standards.
3. After mould design confirmed, We will order the steel and mould base tooling. In the meantime, sending customer the tooling & processing schedule.
4. Mould components purchasing and preparation. 
5. Sending the mould situation to customer by photos weekly. QC Dept following the mould processing schedule closely, controlling the mould quality strictly.
6. Checking the mould: polishing,texture, waterline and so on.
7. Assembling.
8. Mould first testing,checking the part dimension, and work out the inspection report documents.
9. Sending the samples and inspection report to customer
10. Customer instruction & confirmation for shipment.

湛江市| 麻栗坡县| 榆林市| 长武县| 米易县| 通河县| 米泉市| 潞城市| 黄浦区| 阿巴嘎旗| 剑河县| 屯昌县| 涪陵区| 满洲里市| 故城县| 翁源县| 玉林市| 酒泉市| 沂南县| 哈尔滨市| 黔东| 江川县| 巴林右旗| 保定市| 内丘县| 榆中县| 龙岩市| 巧家县| 黔西县| 安岳县| 依兰县| 卓尼县| 仙游县| 虹口区| 顺义区| 纳雍县| 武山县| 枣强县| 南漳县| 北票市| 新平|