久久综合香蕉久久久久久久,亚洲国产美女精品久久,久久久久久久999,久久久精品久久

Design & Tooling

Automotive Mould E-catalogue
I'm on line,contact now.

Production Process
Home?>>? Design & Tooling?>>? Production Process

The quality goes in before the name goes on
1. Mould manufacture standard documents will be done by Engineering Dept an we will have a meeting for the new mould.
2. Mould design: 3D,2D drawing designed according to customers' requests and standards.
3. After mould design confirmed, We will order the steel and mould base tooling. In the meantime, sending customer the tooling & processing schedule.
4. Mould components purchasing and preparation. 
5. Sending the mould situation to customer by photos weekly. QC Dept following the mould processing schedule closely, controlling the mould quality strictly.
6. Checking the mould: polishing,texture, waterline and so on.
7. Assembling.
8. Mould first testing,checking the part dimension, and work out the inspection report documents.
9. Sending the samples and inspection report to customer
10. Customer instruction & confirmation for shipment.

商水县| 华安县| 云霄县| 抚远县| 广宁县| 葫芦岛市| 金乡县| 黄浦区| 古浪县| 榆中县| 上林县| 陇西县| 长沙县| 晋州市| 谢通门县| 定结县| 大埔县| 武强县| 苍溪县| 石楼县| 台中县| 皋兰县| 齐河县| 青海省| 阳西县| 张家港市| 定兴县| 房山区| 长寿区| 青河县| 定陶县| 镇坪县| 忻州市| 武隆县| 林西县| 郁南县| 金昌市| 密云县| 牡丹江市| 贡觉县| 沭阳县|